
-
Architects: TJAD Atelier L+
- Area: 21750 m²
- Year: 2024
-
Photographs:Shengliang Su
-
Manufacturers: Tongyan Zhizhu, Xinyi Glass
-
Lead Architects: Linxue Li
-
Acoustic Consultants: Shanghai Acoustical Society, Jiang Guorong
-
Floodlighting: Tongji University, Luoxi Hao, Rongdi Shao

Text description provided by the architects. Tongji University Jiading Campus was established in 2002. The campus still lacks an attractive public cultural core. Yijia Building (Students' Activity Center) has been endowed with a heterogeneous and catalytic role, hoping to provide a spatial experience different from teaching and colleges, and become a powerful anchor point to activate the cultural vitality of the campus.
